• Share this page on Facebook
  • Print this page

Energy & Earth Resources Fees and Charges

Act/Regs
Reference
Rate No. of Fee units/Penalty units Current, Including GST (if applicable) Fee or charge
Geothermal Energy Resources Regulations 2006
r. 31 12.22 400 $4,888.00 Exploration Permit - fee for application for exploration permit
r. 31 12.22 200 $2,444.00 Exploration Permit - fee for renewal of exploration permit
r. 31 12.22 550 $6,721.00 Exploration Permit - Annual fee for exploration permit
r. 31 12.22 400 $4,888.00 Exploration Permit - Fee for transfer of exploration permit
r. 31 12.22 400 $4,888.00 Retention Leases - Fee for application for retention lease.
r. 31 12.22 550 $6,721.00 Retention Leases - Annual fee for retention lease
r. 31 12.22 400 $4,888.00 Retention Leases - Fee for transfer of retention lease
r. 31 12.22 1000 $12,220.00 Extraction Licenses - Application fee for extraction licence
r. 31 12.22 550 $6,721.00 Extraction Licenses - Annual fee for extraction licence
r. 31 12.22 400 $4,888.00 Extraction Licenses - fee for transfer of extraction licence.
r. 31 12.22 2 $24.40 Geothermal Energy Register - Inspection of the geothermal energy register
r. 31 Per A4 page   $4.00 Geothermal Energy Register - Copy of document or entry in geothermal energy register.
r. 31 12.22 5 $61.10 Geothermal Energy Register - Certificate under section 159 (2) of the Act as to matter relating to contents of geothermal energy register.
Greenhouse Gas Geological Sequestration Regulations 2009
31 (1) 12.22 400 $4,888.00 Fee for Application for an Exploration Permit.
31 (2) 12.22 400 $4,888.00 Fee for Application for a Retention Licence.
31 (3) 12.22 1000 $12,220.00 Fee for Application for an Injection and Monitoring Licence.
31 (4) 12.22 40 $488.80 Fee for Application for a Special Access Authorisation.
32 12.22 10 $122.20 Late Fee for Renewal of Exploration Permit for each week or part there of after the due day for payment.
33 12.22 200 $2,444.00 Fee for Renewal of Exploration Permit.
34 12.22 10 $122.20 Late Fee for Retention Lease for each week or part there of after the due day for payment.
35 (1-a) 12.22 550 $6,721.00 Annual Fee for an Exploration Permit.
35 (1-b) 12.22 550 $6,721.00 Annual Fee for a Retention Lease.
35 (1-c) 12.22 550 $6,721.00 Annual Fee for an Injection and Monitoring Licence.
36 (a) 12.22 400 $4,888.00 Fee for Transfer, or Part Transfer, of an Exploration Permit.
36 (b) 12.22 200 $2,444.00 Fee for Renewal of a Retention Lease
36 (c.) 12.22 400 $4,888.00 Fee for Transfer of a Retention Lease.
36 (d) 12.22 400 $4,888.00 Fee for Transfer, or Part Transfer, of an Injection and Monitoring Licence.
37 (a) 12.22 2 $24.40 Fee for Inspection of the Greenhouse Gas Sequestration Register.
37 (c.) Per page   $4.00 Fee for each Page of a Copy of a Document or Entry in the Greenhouse Gas Sequestration Register.
38 12.22 5 $61.10 Fee for Minister's Certificate.
Mineral Resources Development Regulations 2002

Schedule 19 Item 1 (Reg 11)

12.22

90

$1,099.80

Application fee for Exploration Licence (per 500 square kilometres)

Schedule 19 Item 2 (Reg 12)

12.22

135

$1,649.70

Application fee for Mining Licence per 260 hectares

Schedule 19 Item 2A (Reg 12A)

12.22

40

$488.80

Application fee for Prospecting Licence

Schedule 19 Item 2B (Reg 12B)

12.22

135

$1,649.70

Application fee for Retention Licence per 260 hectares

Schedule 19 Item 3 (Reg 13)

12.22

2.5

$30.60

Application fee for a miner's right that will be current for a time not exceeding 2 years.

Schedule 19 Item 3A (Reg 13)

12.22

7

$85.50

Application fee for a miner's right that will be current for a time greater than 2 years but not exceeding 10 years.

Schedule 19 Item 4 (Reg 14)

12.22

30

$366.60

Application fee for Tourist Fossicking Authority (2 year term)

Schedule 19 Item 4A (Reg 14)

12.22

40.5

$494.90

Application fee for Tourist Fossicking Authority (10 year term)

Schedule 19 Item 6 (Reg 22)

12.22

85

$1,038.70

Application fee for Mining Licence Renewal per 260 hectares

Schedule 19 Item 7 (Reg 22)

12.22

90

$1,099.80

Application fee for Exploration Licence Renewal (per 500 square kilometres)

Schedule 19 Item 7A (Reg 22)

12.22

85

$1,038.70

Application fee for Retention Licence Renewal per 260 hectares

Schedule 19 Item 8 (Reg 28)

12.22

1.5

$18.30

Rent for a Mining Licence (per hectare)

Schedule 19 Item 8A (Reg 28)

12.22

1.5

$18.30

Rent for a Prospecting Licence (per hectare)

Schedule 19 Item 9 (Reg 29)

12.22

10

$122.20

Application fee for variation of a licence

Schedule 19 Item 11 (Reg 32)

12.22

30

$366.60

Application for transfer of a licence

Schedule 19 Item 12 (Reg 32)

12.22

30

$366.60

An amalgamation of a licence under section 36 of the Act made at the request of the licensee

Reg 34(1)

12.22

2.5

$30.60

Access to mining register

Reg 34(2)

Per page

 

$8.00

The fee for the provision of information under section 74(1)(b) of the Act is $8.00 for the first printed page and $1.00 for each additional printed page.

Reg 34(3)

Per copy

 

$8.00

The fee for the provision of a copy of a licence under section 74(1)(c) of the Act is $8.00.

Reg 34(4)

Per page

 

$8.00

The fee for the provision of a copy of a work plan or a variation to a work plan under section 74(1)(d) or 74(1)(e) of the Act is $8.00 for the first printed page and $1.00 for each additional page or $2.00 for each additional page printed in colour.

Reg 34(5)

12.22

2.5

$30.60

The fee for a certificate of information issued by the Department Head under section 76 of the Act is 2.5 fee units.

Mineral Resources (Sustainable Development) (Extractive Industry) Regulations 2010
Reg 4 12.22 31 $378.80 Fee for Lodging a Work Plan.
Reg 6 (1) 12.22 26 $317.70 Fee for Application to Vary a Work Plan
Reg 8 (a) 12.22 41 $501.00 Fee for Application of a Work Authority Over an Area of 5HA or More or Greater Than 5 Metres In Depth.
Reg 8 (b) 12.22 10 $122.20 Fee for Application of a Work Authority Over an Area not Exceeding 5HA And not Exceeding 5 Metres In Depth.
Reg 9 12.22 26 $317.70 Fee for Request to Vary a Work Authority
Reg 10 12.22 16 $195.50 Fee for Transfer of a Work Authority
Reg 15 (1-a) 12.22 24 $293.30 Fee for an Inspection of a Work Authority Site of 5HA or More or Greater Than 5 Metres In Depth.
Reg 15 (1-b) 12.22 11 $134.40 Fee for an Inspection of a Work Authority Site not Exceeding 5 hectares and not exceeding 5 Metres In Depth
Offshore Petroleum and Greenhouse Gas Storage Regulations 1985

APPLICATION FEES

      $4,590.00 Work-bid petroleum exploration permit
      $4,590.00 Special petroleum exploration permit
      $1,835.00 Cash-bid petroleum exploration permit
      $1,835.00 Renewal of petroleum exploration permit (all types)
      $1,835.00 Petroleum retention lease (all types)
      $1,835.00 Renewal of petroleum retention lease
      $4,590.00 Petroleum production licence over a surrendered block
      $920.00 Petroleum production licence over an individual block
      $1,835.00 Petroleum production licence
      $1,835.00 Renewal of a petroleum production licence (all types)
      $1,835.00 Infrastructure licence (petroleum and greenhouse)
      $4,590.00 Pipeline licence (petroleum and greenhouse)
      $920.00 Variation of a pipeline licence
      $920.00 Petroleum special prospecting authority
      $0.00 Work-bid greenhouse gas assessment permit
      $0.00 Cash-bid greenhouse gas assessment permit
      $0.00 Renewal of greenhouse gas assessment permit
      $1,835.00 Greenhouse gas holding lease (all types)
      $1,835.00 Renewal of greenhouse gas holding lease
      $1,835.00 Greenhouse gas injection licence
      $0.00 Greenhouse gas search authority
      $4,590.00 Greenhouse gas site closing authority

REGISTER ENTRIES/INSPECTION/EVIDENCE FEES (petroleum and greenhouse gas titles)

      $92.00 Devolution of title
      $92.00 Change in name of company
      $19.00 Inspection of register/instruments
  Per page   $3.50 Copies/extracts from register/instruments (per page)
      $45.00 Evidentiary certificate
  Per day (or part thereof   $38.00 Loan of document/samples (per day/part day)
  Per hour (or part thereof)   $38.00 Search for document/samples (per hour/part hour)
  Per day (or part thereof)   $38.00 Core (Sample) Loan per day (or part thereof)
Offshore Petroleum and Greenhouse Gas Storage (Annual Fees) Regulations 1994

ANNUAL FEES

      $1,135.00 Petroleum exploration permit (minimum)
      $55.00 Petroleum exploration permit (block)
      $6,820.00 Petroleum retention lease (per block)
      $20,460.00 Petroleum production licence (per block)
      $13,640.00 Infrastructure licence (per title)
  Per Km offshore (or part thereof)   $90.00 Pipeline licence (per km or part thereof)
      $6,820.00 Greenhouse gas holding lease (per block)
      $20,460.00 Greenhouse gas injection licence fee (per block)
Offshore Petroleum and Greenhouse Gas Storage (Registration Fees) Regulations 1990

REGISTRATION FEES FOR DEALINGS & TRANSFERS

      1.5% of value of consideration Transfer/dealing ad valorem (petroleum and greenhouse gas titles)
      $920.00 Transfer (minimum) (petroleum titles)
      $920.00 Transfer to give effect to a dealing (petroleum titles)
      $4,590.00 Transfer due to reorganisation of corporations (petroleum titles)
      $920.00 Dealing (minimum) (petroleum titles)
      $4,590.00 Dealing due to reorganisation of corporations (petroleum titles)
      $920.00 Transfer (minimum) (greenhouse gas titles)
      $920.00 Transfer to give effect to a dealing (greenhouse gas titles)
      $4,590.00 Transfer due to reorganisation of corporations (greenhouse gas titles)
      $920.00 Dealing (minimum) (greenhouse gas titles)
      $920.00 Dealing due to reorganisation of corporations (greenhouse gas titles)
Petroleum (Submerged Lands) Regulations 2004
202 Per page   $3.00 Register Copies per page
202     $39.00 Register Certificate
203     $1,000.00 Exploration Permit Fees
203(1)     $50.00 Exploration Permit Fees per Block (if total amount greater than above)
204     $6,000.00 Retention Lease Fees per Block
205     $18,000.00 Production Licence Fees per Block
206     $80.00 Pipeline Licence Fees (per km offshore or part thereof)
207     $18,000.00 Infrastructure Licence Fee
201     $3,900.00 Application for Permit
201     Cash bid Application fee for Permit by cash bid
201     $3,900.00 Application for Permit in Respect of Surrendered Blocks
201     $1,560.00 Application for Renewal of Permit
201     $1,560.00 Application by permittee for lease
201     $1,560.00 Application by licensee for lease
201     $1,560.00 Application for Renewal of Lease
201     $1,560.00 Application for Licence
201     $3,900.00 Application for Licence in Respect of Surrendered Blocks
201     $780.00 Application for licence in respect of individual blocks
201     $1,560.00 Application for infrastructure licence
201     $1,560.00 Application for variation of infrastructure licence
201     $3,900.00 Application for pipeline licence
201     $780.00 Application for variation of pipeline licence
201     $78.00 Entries in register on devolution of title
201     $78.00 Substitution of company name on Register
201     $16.00 Inspection of Register and documents
201     $780.00 Entry in Register and transfer of title
201     $780.00 Entry in Register of transfer of a title giving effect to a dealing
201     $3,900.00 Entry in Register and of a title by related corporations
201     $780.00 Entry of Register of approval of a dealing under section 81 of the Act
201     $3,900.00 Entry in Register of approval of a dealing by related corporations
201     $780.00 Application for special prospecting authority
Petroleum Regulations 2011
Reg 30 (1) 12.22 700 $8,554.00 Application for an exploration permit
Reg 30 (2) 12.22 500 $6,110.00 Application for a retention licence
Reg 30 (3) 12.22 500 $6,110.00 Application for a production licence
Reg 30 (4) 12.22 250 $3,055.00 Application for a special access authorisation
Reg 31 12.22 250 $3,055.00 Renewal of an exploration permit
Reg 32 (1) (a) 12.22 500 $6,110.00 Annual fees for exploration permit
Reg 32 (1) (b) 12.22 700 $8,554.00 Annual fees for a retention lease
Reg 32 (1) (c) 12.22 700 $8,554.00 Annual fees for a production licence
Reg 33 (a) 12.22 250 $3,055.00 Transfer, or partial transfer, of an exploration permit
Reg 33 (b) 12.22 150 $1,833.00 Transfer of a retention lease
Reg 33 ( c) 12.22 250 $3,055.00 Transfer, or partial transfer, of a production licence
Reg 34 (a) 12.22 150 $1,833.00 Suspension or variation of conditions of an exploration permit
Reg 34 (b) 12.22 150 $1,833.00 Suspension or variation of conditions of a retention lease
Reg 34 (c ) 12.22 150 $1,833.00 Suspension or variation of conditions of a production licence
Reg 35 12.22 5 $61.10 Registration of a document under section 232 of the Petroleum Act 1998
Reg 36 12.22 2 $24.40 Inspection of the petroleum register
Reg 50(3) Per page   $4.00 Each page of a copy of a document or entry in the petroleum register
Reg 50(2) 12.22 5 $61.10 For the purpose of section 237(2) of the Petroleum Act 1998, the fee payable for a Minister's certificate
Pipeline Act 2005
Pipelines Regulations 2007 -Reg 13 12.22 142.7 $1,743.80 Application to amend the conditions of the licence
Pipelines Regulations 2007 -Reg 15 12.22 142.7 $1,743.80 Application for the consolidation of licences
Pipelines Regulations 2007 -Reg 18 12.22 44 $537.70 Lodging notice with Registrar of Titles
Pipelines Regulations 2007 -Reg 25 12.22 285.4 $3,487.60 Application to use pipeline to convey other thing
Pipelines Regulations 2007 -Reg 26 12.22 142.7 $1,743.80 Application for Ministerial direction under section 122
Pipelines Regulations 2007 -Reg 27 12.22 142.7 $1,743.80 Application for approval of access to a pipeline easement
Pipelines Regulations 2007 -Reg 44 (1) 12.22 37.6 $459.50 Access to registered information - time fee
Pipelines Regulations 2007 -Reg 44 (2) 12.22 0.5 $6.10 Access to registered information - page fee
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 2818.1 $34,437.20 Pipeline Length: Less than 10km (Environmental Effects Statement required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 1412.6 $17,262.00 Pipeline Length: Less than 10km (Environmental Effects Statement NOT required - subject to conditions)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 528 $6,452.20 Pipeline Length: Less than 10km (Environmental Effects Statement NOT required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 4245.1 $51,875.10 Pipeline Length: 10-20 km (Environmental Effects Statement required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 2375.8 $29,032.30 Pipeline Length: 10-20 km (Environmental Effects Statement NOT required - subject to conditions)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 528 $6,452.20 Pipeline Length: 10-20 km (Environmental Effects Statement NOT required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 4245.1 $51,875.10 Pipeline Length: 20-50 km (Environmental Effects Statement required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 2782.5 $34,002.20 Pipeline Length: 20-50 km (Environmental Effects Statement NOT required - subject to conditions)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 948.9 $11,595.60 Pipeline Length: 20-50 km (Environmental Effects Statement NOT required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 4245.1 $51,875.10 Pipeline Length: 50-100 km (Environmental Effects Statement required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 2782.5 $34,002.20 Pipeline Length: 50-100 km (Environmental Effects Statement NOT required - subject to conditions)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 948.9 $11,595.60 Pipeline Length: 50-100 km (Environmental Effects Statement NOT required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 4245.1 $51,875.10 Pipeline Length: More than 100 km (Environmental Effects Statement required)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 3710 $45,336.20 Pipeline Length: More than 100 km (Environmental Effects Statement NOT required - subject to conditions)
Pipelines Regulations 2007 -Reg 9 (Schedule 2 - Table A) 12.22 1441.2 $17,611.50 Pipeline Length: More than 100 km (Environmental Effects Statement NOT required)
Pipelines Regulations 2007 -Reg 12 (Schedule 2 - Table B) 12.22 1676.6 $20,488.10 GRANT FEE: Pipeline length: Less than 10 km
Pipelines Regulations 2007 -Reg 12 (Schedule 2 - Table B) 12.22 3710 $45,336.20 GRANT FEE: Pipeline length: 10-20 km
Pipelines Regulations 2007 -Reg 12 (Schedule 2 - Table B) 12.22 5543.5 $67,741.60 GRANT FEE: Pipeline length: 20-50 km
Pipelines Regulations 2007 -Reg 12 (Schedule 2 - Table B) 12.22 6970.4 $85,178.30 GRANT FEE: Pipeline length: 50-100 km
Pipelines Regulations 2007 -Reg 12 (Schedule 2 - Table B) 12.22 8540 $104,358.80 GRANT FEE: Pipeline length: More than 100 km
Energy & Earth Resources Penalties
Greenhouse Gas Geological Sequestration Regulations 2009
Reg 26 (1) 122.14 10 $1,221.40 Failure to submit to the Minister a report that complies with subregulation (2) of the greenhouse gas sequestration operations.
Reg 28 (3) 122.14 10 $1,221.40 An officer must not perform or exercise any function or power under the Act in relation to a matter to which a reportable interest relates unless the Minister authorises her or him to do so.
Mineral Resources (Sustainable Development) (Extractive Industry) Regulations 2010
Reg 16 122.14 10 $1,221.40 Certain information to be kept at the quarry
Reg 18 (2) 122.14 20 $2,442.80 The holder of a work authority must ensure that the payment is accompanied by a signed statutory declaration
Reg 18 (3) 122.14 10 $1,221.40 The holder of a work authority must retain copies of records of sales and production for inspection purposes for 6 years.
Schedule 4 - Item 1 122.14 10 $1,221.40 Searching for stone on Crown land without consent.
Schedule 4 - Item 2 122.14 10 $1,221.40 Searching for stone on Private land without consent.
Schedule 4 -Item 3 122.14 5 $610.70 Failing to comply with extractive industry work authority when carrying out extractive industry.
Schedule 4 -Item 4 122.14 10 $1,221.40 Failing to comply with notice prohibiting further work.
Schedule 4 -Item 5 122.14 10 $1,221.40 Failing to comply with a lawful requirement of an inspector.
Schedule 4 -Item 6 122.14 10 $1,221.40 Failing to comply with a notice issued under section 110(2) of the Mineral Resources (Sustainable Development) Act 1990.
Schedule 4 -Item 7 122.14 2 $244.30 Failure by holder of an extractive industry work authority to provide required information.
Schedule 4 -Item 8 122.14 2 $244.30 Failing to ensure that required documents and information are made available for the manager.
Mineral Resources Development Regulations 2002
Reg 10(1) 122.14 20 $2,442.80 Provide to the State information on the production and royalties owed from the mining operations in that period
Reg 10(3) 122.14 10 $1,221.40 Failure to retain books and records for at least five years
Reg 17(1) 122.14 10 $1,221.40 Marking out of mining licence
Reg 17(3) 122.14 10 $1,221.40 The holder of a mining licence must remove or alter any corner posts or markers and must do so within the time specified
Reg 17(4) 122.14 10 $1,221.40 The licence holder must maintain the corner posts and any markers and make sure that the metal plates remain in a legible condition
Reg 18(4) 122.14 20 $2,442.80 Exemption from marking out licence
Reg 19 122.14 10 $1,221.40 Removal of corner posts
Reg 26(1) 122.14 10 $1,221.40 The holder of a licence must keep a record of the exploration and mining activities
Reg 26(3) 122.14 10 $1,221.40 The holder, or former holder, of a licence must submit the annual return
Reg 26(7) 122.14 10 $1,221.40 If the Department Head extends the period of time the holder must submit the return within that extended period of time.
Reg 27(2) 122.14 10 $1,221.40 The holder of the licence must submit the annual report
Reg 27(7) 122.14 10 $1,221.40 If the Department Head extends the period of time the holder must submit the return within that extended period of time.
Reg 45(1) 122.14 10 $1,221.40 An officer must disclose the interest or income source
Reg 45(2) 122.14 10 $1,221.40 An officer must not perform or exercise any function or power in relation to the matter to which the interest relates
Reg 46 (1) 122.14 10 $1,221.40 An officer must submit to the Minister a statement of disclosure 30 days after becoming an officer.
Reg 46 (2) 122.14 10 $1,221.40 An officer must submit to the Minister a statement of disclosure when notifying any change in an interest.
Schedule 22 - Item 6010 122.14 5 $610.70 Prospect, fossick or otherwise search for minerals, or carry out any exploration or mining, on any land other than in accordance with legislation
Schedule 22 - Item 6020 122.14 10 $1,221.40 As the holder of a mining licence, fail to survey and mark out boundaries
Schedule 22 - Item 6030 122.14 10 $1,221.40 Enter any land without the required insurance
Schedule 22 - Item 6040 122.14 10 $1,221.40 Do any work under a licence otherwise than in accordance with the licence
Schedule 22 - Item 6050 122.14 10 $1,221.40 As the holder of a mining licence, do work under a licence without a work authority
Schedule 22 - Item 6060 122.14 10 $1,221.40 Do work under a licence without the required insurance
Schedule 22 - Item 6070 122.14 10 $1,221.40 As the holder of an exploration licence, carry out any work on the land covered other than in accordance with legislation
Schedule 22 - Item 6080 122.14 10 $1,221.40 As the holder of a miner's right, use any equipment for the purposes of excavation on the land
Schedule 22 - Item 6090 122.14 10 $1,221.40 As the holder of a miner's right, use explosives on the land
Schedule 22 - Item 6100 122.14 10 $1,221.40 As the holder of a miner's right, remove or damage any tree or shrub on the land
Schedule 22 - Item 6110 122.14 10 $1,221.40 As the holder of a miner's right, disturb any Aboriginal place or Aboriginal object
Schedule 22 - Item 6120 122.14 5 $610.70 As s holder of a miner's right, fail to repair any damage to the land arising out of the search
Schedule 22 - Item 6130 122.14 10 $1,221.40 As a holder of a tourist fossicking authority, use any equipment for the purposes of excavation of the land
Schedule 22 - Item 6140 122.14 10 $1,221.40 As a holder of a tourist fossicking authority, use explosives on the land
Schedule 22 - Item 6150 122.14 10 $1,221.40 As a holder of a tourist fossicking authority, remove or damage any tree or shrub on the land
Schedule 22 - Item 6160 122.14 10 $1,221.40 As a holder of a tourist fossicking authority, disturb any Aboriginal place or Aboriginal object
Schedule 22 - Item 6170 122.14 10 $1,221.40 As a holder of a tourist fossicking authority, fail to ensure that a person who searches for minerals does not breach legislation
Schedule 22 - Item 6180 122.14 2.5 $305.40 As a holder of a tourist fossicking authority, fail to repair any damage to the land
Schedule 22 - Item 6190 122.14 10 $1,221.40 Operate a tourist mine other than in accordance with the authority
Schedule 22 - Item 6200 122.14 10 $1,221.40 As a holder of a tourist mine authority, fail to comply with the terms and conditions
Schedule 22 - Item 6210 122.14 10 $1,221.40 As a holder of a tourist mine authority, fail to comply with any instructions given by the mine manager
Schedule 22 - Item 6220 122.14 10 $1,221.40 As a holder of a tourist mine authority, commence activity in the mine without approval and all the necessary consents
Schedule 22 - Item 6230 122.14 10 $1,221.40 Fail to comply with a notice under section 80(5) of the Mineral Resources Development Act 1990
Schedule 22 - Item 6240 122.14 10 $1,221.40 Fail to comply with a notice under section 110(2) of the Mineral Resources Development Act 1990
Schedule 22 - Item 6250 122.14 2 $244.30 Fail to send a production and royalty return to the Department Head
Schedule 22 - Item 6260 122.14 2 $244.30 Remove or alter any corner posts or markers required
Schedule 22 - Item 6270 122.14 2 $244.30 Fail to remove or alter any corner posts or marked when required to do so
Schedule 22 - Item 6280 122.14 2 $244.30 As the holder of a licence, fail to keep record of exploration or mining activities undertaken under the licence
Schedule 22 - Item 6290 122.14 2 $244.30 As the holder of a licence, fail to submit an annual return within 4 weeks after the due date
Petroleum Regulations 2011
Reg 14(1) 122.14 20 $2,442.80 The holder of an authority must not conduct a production or drill seam test in an exploration or development well that has not been opened to production except with, and in accordance with, the written consent of the Miniser
Reg 15(1) 122.14 20 $2,442.80 The holder of an authority must ensure that a well is not suspended except with, and in accordance with, the written consent of the Minister
Reg 15(2) 122.14 20 $2,442.80 The holder of an authority must ensure that a well with a measureable interval of petroleum is not abandoned except with, and in accordance with, the written consent of the Minister
Reg 22(2) 122.14 20 $2,442.80 The holder of an authority must give notice of a reportable incident to the Minister as soon as is practicable
Reg 22(4) 122.14 20 $2,442.80 As soon as is practicable after the holder of an authority has given notice to the Miniser under subregulation (2), the holder must give the Minister a written report
Reg 23(3) 122.14 20 $2,442.80 For the purpose of section 179(b) of the Petroleum Act 1998, the holder of a production licence must retain a copy of records of petroleum extrated or recovered for inspection purposes for 5 years
Reg 26(2) 122.14 20 $2,442.80 An officer must not perform or exercise any function or power under the Petroleum Act 1998 in relation to a matter to which a reportable interest relates unless the Minister authorises her or him to do so
Pipeline Act 2005
Pipelines Regulations 2007 -Reg 19(1) 122.14 20 $2,442.80 A licensee must notify the Minister of a reportable environmental incident or a reportable safety incident in accordance with subregulation (2).
Pipelines Regulations 2007 -Reg 19(3) 122.14 20 $2,442.80 A licensee must, as soon as practicable but not later than 7 days after the occurrence of a reportable environmental incident or a reportable safety incident, submit a written report to the Minister
Pipelines Regulations 2007 -Reg 19(4) 122.14 20 $2,442.80 A licensee must keep a record of all reportable environmental incidents and reportable safety incidents that occur during the pipeline operation.
Pipelines Regulations 2007 -Reg 20(1) 122.14 20 $2,442.80 A person must not interfere with the place of an incident referred to in regulation 19 during the period of investigation of the incident without the consent of a person or body referred to in subregulation (2) that is investigating the incident
Pipelines Regulations 2007 -Reg 22(1a &1 b) 122.14 20 $2,442.80 keep a written report of each inspection of the pipeline undertaken in accordance with AS 2885.3—2001